{"id":8571,"date":"2023-06-02T11:50:11","date_gmt":"2023-06-02T11:50:11","guid":{"rendered":"https:\/\/www.greenhome.co.me\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/"},"modified":"2023-06-02T20:15:15","modified_gmt":"2023-06-02T20:15:15","slug":"predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi","status":"publish","type":"post","link":"https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/","title":{"rendered":"Shadow Report Presentation for Chapter 27: &#8220;Progress on Pause&#8221;"},"content":{"rendered":"\n<p>In anticipation of the European Green Week, Coalition 27 presented the Shadow Report for Chapter<br>27: &#8220;Progress on Pause&#8221;, which aims to present an overall picture of Montenegro&#8217;s progress in the<br>EU accession process for the period from January 2022 to May 2023, in terms of improving the<br>situation in the field of environmental protection and climate change.<br>The report deals with ten thematic areas from Chapter 27, and refers to the implementation of the<br>remaining obligations from the National Strategy, which are now an integral part of the Action Plan<br>for meeting the final benchmarks in Chapter 27 &#8211; Environment and Climate Change.<br>The evaluation of the implemented activities in this area, can be sensed already in the very title of<br>the report &#8220;Progress on pause&#8221; (draft), and in addition to the analysis of essential problems, the<br>readers of the report also have a set of recommendations for strengthening the process of<br>transposition and implementation of EU legislation included in Chapter 27.<br>The report was presented by Ksenija Medenica in front of the Center for the Protection and Study<br>of Birds, Azra Vukovi\u0107 from the NGO Green Home, Milica Kandi\u0107, a consultant, and Miodrag<br>Karad\u017ei\u0107 from the Society of Young Ecologists and Northland.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-13-of-31-1-1024x682.jpg\" alt=\"\" class=\"wp-image-8566\" srcset=\"https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-13-of-31-1-1024x682.jpg 1024w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-13-of-31-1-300x200.jpg 300w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-13-of-31-1-768x512.jpg 768w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-13-of-31-1-1536x1024.jpg 1536w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-13-of-31-1-600x400.jpg 600w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-13-of-31-1-560x373.jpg 560w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-13-of-31-1.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The preparation of the report was coordinated by Milica Kandi\u0107, as an external expert, who<br>presented the methodology and a comprehensive overview of the report.<br>When it comes to the sub-field of Nature Protection, the report showed that certain progress has<br>been made in this area, said Ksenija Medenica in front of the Center for the Protection and Study<br>of Birds.<br>&#8220;It is primarily reflected in the initiation of the process of amendments to the Law on Nature<br>Protection and the Law on Forests, which should be adopted as soon as possible.&#8221; Also, revisions of<br>the protection studies for the National Parks: Durmitor, Lov\u0107en and Skadar Lake have been<br>initiated, while the revision process for the NP Biogradska Gora has been completed, and the final<br>step remains for the study to be adopted. It is also positive that the creation of protection studies<br>for new areas has been initiated: the river Mrtvica and its surroundings, the Draft Protection Study<br>for the Great City Park in Pljevlja and the procedure for the preventive protection of Valdanos and<br>Maslinada in Ulcinj. Work on the establishment of Natura 2000 continues, and the preparation of<br>Red Lists for amphibians and reptiles, plants and fish is underway,&#8221;- Medenica said.<br>However, even though there is some progress, the nature of Montenegro is threatened and it is<br>necessary to devote oneself to solving numerous problems in this area.<br>&#8220;First of all, the management of protected areas stands out as a problem. The national parks of<br>Montenegro have been without management plans since 2020. They are currently being prepared,<br>but it is a paradox that they will be adopted in the second half of the current year, but for the period<br>from 2020. to 2025. It is encouraging that the preparation of the Plans was finally approached<br>thoroughly, so we hope for quality documents and their implementation in the near future.&#8221; &#8211;<br>Medenica said.<\/p>\n\n\n\n<p>Then she emphasized that protected areas, apart from bad management, are also threatened by<br>unplanned construction.<br>&#8220;Examples that show this are the building permits issued in Prokletije National Park in the heart of<br>the park, in the Grebaje valley. Then, the consequences of the construction of the highway on the<br>river Tara, but also some future plans, such as the announced construction of the bridge on Bojana,<br>which has been announced several times in the media and has no basis in plain planning<br>documentation. Poor spatial planning in valuable areas has long been a topic in the international<br>community, so the case of the construction of Porto Skadar Lake and HPP Komarnica, has the<br>attention of the Berne Convention, which has sent recommendations to the Government of<br>Montenegro for both cases. \u201e- Medenica drew attention.<br>As in previous years, the problems of the Ulcinj Saltworks have a special place in the Report. The<br>unresolved issue of the management structure, four years after the declaration of the protected<br>area, is the biggest obstacle to the implementation of measures to protect this area.<br>&#8220;The ignorant attitude of the local government towards the obligation that they should have<br>fulfilled a long time ago is particularly worrying.\u201e \u2013 Medenica said.<br>One of the particularly significant issues in the field of nature protection, which has never been<br>included in the Progress Report of Montenegro, is the issue of poaching. As Medenica says, despite<br>numerous initiatives to change the legislative framework, references to the need for reform of<br>hunting in Montenegro, as well as requests for better intersectoral cooperation, in the past year the<br>competent Ministry of Agriculture has done absolutely nothing to solve the problem of poaching.<br>&#8220;Finally, in the field of nature protection, cases of the construction of a military training ground in<br>Sinaia are also described, which is apparently still being planned despite the importance of this area<br>from the point of view of the richness of biodiversity and despite the petition of the citizens&#8217;<br>initiative, which has over 22 thousand signatures of dissatisfied citizens of Montenegro.\u201c \u2013<br>Medenica concluded.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-4-of-31-1-1024x682.jpg\" alt=\"\" class=\"wp-image-8568\" srcset=\"https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-4-of-31-1-1024x682.jpg 1024w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-4-of-31-1-300x200.jpg 300w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-4-of-31-1-768x512.jpg 768w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-4-of-31-1-1536x1024.jpg 1536w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-4-of-31-1-600x400.jpg 600w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-4-of-31-1-560x373.jpg 560w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-4-of-31-1.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><br><\/p>\n\n\n\n<p>Azra Vukovi\u0107 from the NGO Green Home referred to the sub-area on waste management and said<br>that the adoption of the new Law on waste management is 5 years late.<br>&#8220;Also, the State Plan for Waste Management in Montenegro, 2023-2028, has not been adopted.<br>Implementation of local waste management plans is at a very low level or non-existent. It has been<br>estimated that 25,000 t are disposed of annually at the unorganized landfill in Mislov do.\u201c<br>In her presentation, Vukovi\u0107 emphasized that the Report on the Implementation of the State Waste<br>Management Plan in 2021 indicates insufficient infrastructure for primary selection, that citizens&#8217;<br>awareness of primary selection is insufficiently developed and there are no incentive measures for<br>citizens to selectively separate waste.<br>In addition to the obvious problems, there are recycling centers in Podgorica, Herceg Novi, Kotor<br>and \u017dabljak. Also, recycling yards.<br>&#8220;There are also regional landfills for non-hazardous waste in Podgorica and Bar (Livade and<br>Mo\u017eura), waste vehicle processing facilities in Podgorica (1) and Nik\u0161i\u0107 (3). We also have recycling<br>yards in Podgorica, Budva, Mojkovac, Plav\u2026&#8221; \u2013 Vukovi\u0107 reminded.<br>However, the situation in some municipalities is not good.<\/p>\n\n\n\n<p>&#8220;The municipality of Plav, although it has a recycling yard with a sorting plant, does not have data<br>on the amount of separately collected waste. Even though the municipality of \u017dabljak has a<br>recycling center, it does not serve its purpose and the decision on selective waste disposal is not<br>applied. In the municipality of Kotor, there is the first composting plant in Montenegro to solve the<br>issue of green waste management in the municipalities of Kotor, Tivat, Budva and Herceg Novi,<br>however, the installed capacities are not sufficient. Most municipalities dispose of waste at<br>temporary landfills.&#8221;- Azra said.<br>Also, only 9 municipalities submitted data on the amount of collected non-hazardous construction<br>waste. Only 3 municipalities have a defined temporary location for non-hazardous construction<br>waste.<br>&#8220;Regarding the question of the treatment of hazardous and non-hazardous waste, the register of<br>polluters was prepared and put into operation, however, it is not in use due to cyber attacks and the<br>problem has not yet been resolved,&#8221; &#8211; Vukovi\u0107 pointed out.<br>Some of the key recommendations, as Vukovi\u0107 says, in order to solve the problem of waste<br>management, would be the new Law on Waste Management, the drafting and adoption of the<br>National Waste Management Plan in Montenegro, the adoption of Local Waste Management Plans,<br>and the provision of incentive measures for citizens in order to implement primary selection,<br>strengthen administrative and operational capacities at the state level, strengthen cooperation<br>between state and local authorities, ensure the functioning of the register of hazardous waste<br>polluters and many others\u2026<br>Miodrag Karad\u017ei\u0107 from the Association of Young Ecologists presented the sub-area of \u200b\u200bair and<br>water quality.<br>A general overview of the situation in the sub-field of water quality shows that the legislation is<br>fully aligned with the EU acquis (the law was adopted in 2007, amended and supplemented in 2015,<br>as well as in 2018).<br>&#8220;However, the register of waters of importance for Montenegro and for waters of local importance<br>has not yet been created, a water information system, national and local operational plans for the<br>protection of waters from accidental pollution for waters of importance have not been established.<br>Inadequate sewage networks for the collection and removal of fecal water are significant problems<br>in the functioning of existing treatment plants, which call into question the efficiency of the<br>management of the waste water system and, therefore, the quality of surface and underground<br>water. It can be said for certain plants that the choice of contractor was also questionable.&#8221; &#8211;<br>Karad\u017ei\u0107 said.<br>According to Karad\u017ei\u0107, according to the findings of the State Audit Institution, sewage sludge is<br>mostly stored within the plant, although its application is defined by the Law on Waste<br>Management and the Rulebook on the specific conditions that municipal sewage sludge should<br>meet. At the level of the State and local self-governments, there are no sewage sludge management<br>plans, which would define the method of treatment and handling of it.<br>In the Report itself, several key recommendations are listed, when it comes to the sub-area of<br>\u200b\u200bwater quality.<\/p>\n\n\n\n<p>It is important to establish Registers of waters of importance for Montenegro and waters of local<br>importance, Establish a Water Information System, which, among other things, contains the<br>cadastre of water polluters; It is necessary for commercial, water supply and sewerage companies<br>that manage waste water treatment plants to establish reliable measurement of the amount of<br>waste water; Adopt a Sewage Sludge Management Plan that would define the manner of handling<br>and treatment of the resulting sewage sludge both at the state level and at the level of local self-<br>governments, and many others. &#8211; Karad\u017ei\u0107 said.<\/p>\n\n\n\n<p>It is important to establish Registers of waters of importance for Montenegro and waters of local<br>importance, Establish a Water Information System, which, among other things, contains the<br>cadastre of water polluters; It is necessary for commercial, water supply and sewerage companies<br>that manage waste water treatment plants to establish reliable measurement of the amount of<br>waste water; Adopt a Sewage Sludge Management Plan that would define the manner of handling<br>and treatment of the resulting sewage sludge both at the state level and at the level of local self-<br>governments, and many others. &#8211; Karad\u017ei\u0107 said.<br>When it comes to the sub-area of \u200b\u200bair quality, a general overview of the situation shows that the<br>National Air Quality Strategy for the period 2021-2029 with the Program of Measures to Reduce<br>Emissions covered by the NEC Directive has not been adopted as planned.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-6-of-31-1024x682.jpg\" alt=\"\" class=\"wp-image-8562\" srcset=\"https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-6-of-31-1024x682.jpg 1024w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-6-of-31-300x200.jpg 300w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-6-of-31-768x512.jpg 768w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-6-of-31-1536x1024.jpg 1536w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-6-of-31-600x400.jpg 600w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-6-of-31-560x373.jpg 560w, https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-6-of-31.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The cadastre of pollutants has not been established, so adequate data on air pollutants have not<br>been provided. Polluters do not monitor and do not submit reports on the conducted monitoring to<br>local governments and the Agency. There is no monitoring of indoor air quality or assessment of the<br>cumulative effects of pollution on public health.- Karad\u017ei\u0107 said.<br>In March 2021, Montenegro submitted to the European Commission an analysis of economically<br>viable emission control strategies for 2020 and 2030, which serves as the basis for the final<br>agreement between the EU and Montenegro on its obligations to reduce emissions under the NEC<br>Directive. In January 2022, the European Commission gave the green light to this document with<br>the recommendation that Montenegro must define obligations to reduce emissions in accordance<br>with the National Energy and Climate Plan, which has not yet been adopted to date, i.e. almost two<br>years later.<br>Karad\u017ei\u0107 sees achieving the prescribed air quality in all zones as the biggest challenge in the area of<br>\u200b\u200bair quality.<\/p>\n\n\n\n<p>The increased concentration of suspended PM particles, especially in the municipalities of Pljevlja,<br>Bijelo Polje, Podgorica and Nik\u0161i\u0107 during the heating season, is worrying both because of the<br>frequency and the amount of concentrations, despite the fact that these municipalities, with the<br>exception of Bijelo Polje, have adopted action plans to improve quality air &#8211; he said.<br>Some of the key recommendations for this area would be: to update the draft of the Air Quality<br>Strategy with new data from the emissions inventory as well as with established emission<br>reduction targets; Adopt air quality plans for zones where pollutant concentrations exceed any<br>established limit or target value, with Action Plans for its implementation; Initiate amendments to<br>the Law on Air Protection in order to more precisely determine the obligations of local self-<br>governments regarding the adoption, implementation and reporting of measures provided for in<br>local action plans; Ensure adequate functionality of air quality monitoring stations in the State Air<br>Quality Monitoring Network; Establish a functional cadastre of pollutants and many others..<\/p>\n\n\n\n<p>The report was prepared within the framework of the project &#8220;Strengthening the participation of<br>civil society in the area of \u200b\u200bthe environment in the EU accession process (4E)&#8221;, which is financially<br>supported by the European Union, through the program &#8220;Civil Society Facility 2021 and Thematic<br>Program on Human Rights and Democracy 2021&#8243;.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In anticipation of the European Green Week, Coalition 27 presented the Shadow Report for Chapter27: &#8220;Progress on Pause&#8221;, which aims to present an overall picture of Montenegro&#8217;s progress in theEU accession process for the period from January 2022 to May 2023, in terms of improving thesituation in the field of environmental protection and climate change.The [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":8559,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[190],"tags":[],"class_list":["post-8571","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-2"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Shadow Report Presentation for Chapter 27: &quot;Progress on Pause&quot; - Green Home<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Shadow Report Presentation for Chapter 27: &quot;Progress on Pause&quot; - Green Home\" \/>\n<meta property=\"og:description\" content=\"In anticipation of the European Green Week, Coalition 27 presented the Shadow Report for Chapter27: &#8220;Progress on Pause&#8221;, which aims to present an overall picture of Montenegro&#8217;s progress in theEU accession process for the period from January 2022 to May 2023, in terms of improving thesituation in the field of environmental protection and climate change.The [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/\" \/>\n<meta property=\"og:site_name\" content=\"Green Home\" \/>\n<meta property=\"article:published_time\" content=\"2023-06-02T11:50:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-06-02T20:15:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-1-of-31.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1333\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"bildwpgreenh\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"bildwpgreenh\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.greenhome.co.me\\\/en\\\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.greenhome.co.me\\\/en\\\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\\\/\"},\"author\":{\"name\":\"bildwpgreenh\",\"@id\":\"https:\\\/\\\/www.greenhome.co.me\\\/#\\\/schema\\\/person\\\/181625c0a7e09b61fbf95576b404d24c\"},\"headline\":\"Shadow Report Presentation for Chapter 27: &#8220;Progress on Pause&#8221;\",\"datePublished\":\"2023-06-02T11:50:11+00:00\",\"dateModified\":\"2023-06-02T20:15:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.greenhome.co.me\\\/en\\\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\\\/\"},\"wordCount\":2076,\"image\":{\"@id\":\"https:\\\/\\\/www.greenhome.co.me\\\/en\\\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.greenhome.co.me\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/izvjestaj-1-of-31.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.greenhome.co.me\\\/en\\\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\\\/\",\"url\":\"https:\\\/\\\/www.greenhome.co.me\\\/en\\\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\\\/\",\"name\":\"Shadow Report Presentation for Chapter 27: \\\"Progress on Pause\\\" - Green Home\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.greenhome.co.me\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.greenhome.co.me\\\/en\\\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.greenhome.co.me\\\/en\\\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.greenhome.co.me\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/izvjestaj-1-of-31.jpg\",\"datePublished\":\"2023-06-02T11:50:11+00:00\",\"dateModified\":\"2023-06-02T20:15:15+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.greenhome.co.me\\\/#\\\/schema\\\/person\\\/181625c0a7e09b61fbf95576b404d24c\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.greenhome.co.me\\\/en\\\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.greenhome.co.me\\\/en\\\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.greenhome.co.me\\\/en\\\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.greenhome.co.me\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/izvjestaj-1-of-31.jpg\",\"contentUrl\":\"https:\\\/\\\/www.greenhome.co.me\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/izvjestaj-1-of-31.jpg\",\"width\":2000,\"height\":1333},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.greenhome.co.me\\\/en\\\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.greenhome.co.me\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Shadow Report Presentation for Chapter 27: &#8220;Progress on Pause&#8221;\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.greenhome.co.me\\\/#website\",\"url\":\"https:\\\/\\\/www.greenhome.co.me\\\/\",\"name\":\"Green Home\",\"description\":\"Za\u0161titimo na\u0161e planine i rijeke\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.greenhome.co.me\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.greenhome.co.me\\\/#\\\/schema\\\/person\\\/181625c0a7e09b61fbf95576b404d24c\",\"name\":\"bildwpgreenh\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d67045f5dce40609ea5ef59659ab9b79ed273be7f27a3db0ce9eb491d85c3f27?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d67045f5dce40609ea5ef59659ab9b79ed273be7f27a3db0ce9eb491d85c3f27?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d67045f5dce40609ea5ef59659ab9b79ed273be7f27a3db0ce9eb491d85c3f27?s=96&d=mm&r=g\",\"caption\":\"bildwpgreenh\"},\"sameAs\":[\"https:\\\/\\\/www.greenhome.co.me\"],\"url\":\"https:\\\/\\\/www.greenhome.co.me\\\/en\\\/author\\\/bildwpgreenh\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Shadow Report Presentation for Chapter 27: \"Progress on Pause\" - Green Home","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/","og_locale":"en_US","og_type":"article","og_title":"Shadow Report Presentation for Chapter 27: \"Progress on Pause\" - Green Home","og_description":"In anticipation of the European Green Week, Coalition 27 presented the Shadow Report for Chapter27: &#8220;Progress on Pause&#8221;, which aims to present an overall picture of Montenegro&#8217;s progress in theEU accession process for the period from January 2022 to May 2023, in terms of improving thesituation in the field of environmental protection and climate change.The [&hellip;]","og_url":"https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/","og_site_name":"Green Home","article_published_time":"2023-06-02T11:50:11+00:00","article_modified_time":"2023-06-02T20:15:15+00:00","og_image":[{"width":2000,"height":1333,"url":"https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-1-of-31.jpg","type":"image\/jpeg"}],"author":"bildwpgreenh","twitter_card":"summary_large_image","twitter_misc":{"Written by":"bildwpgreenh","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/#article","isPartOf":{"@id":"https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/"},"author":{"name":"bildwpgreenh","@id":"https:\/\/www.greenhome.co.me\/#\/schema\/person\/181625c0a7e09b61fbf95576b404d24c"},"headline":"Shadow Report Presentation for Chapter 27: &#8220;Progress on Pause&#8221;","datePublished":"2023-06-02T11:50:11+00:00","dateModified":"2023-06-02T20:15:15+00:00","mainEntityOfPage":{"@id":"https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/"},"wordCount":2076,"image":{"@id":"https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/#primaryimage"},"thumbnailUrl":"https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-1-of-31.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/","url":"https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/","name":"Shadow Report Presentation for Chapter 27: \"Progress on Pause\" - Green Home","isPartOf":{"@id":"https:\/\/www.greenhome.co.me\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/#primaryimage"},"image":{"@id":"https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/#primaryimage"},"thumbnailUrl":"https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-1-of-31.jpg","datePublished":"2023-06-02T11:50:11+00:00","dateModified":"2023-06-02T20:15:15+00:00","author":{"@id":"https:\/\/www.greenhome.co.me\/#\/schema\/person\/181625c0a7e09b61fbf95576b404d24c"},"breadcrumb":{"@id":"https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/#primaryimage","url":"https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-1-of-31.jpg","contentUrl":"https:\/\/www.greenhome.co.me\/wp-content\/uploads\/2023\/06\/izvjestaj-1-of-31.jpg","width":2000,"height":1333},{"@type":"BreadcrumbList","@id":"https:\/\/www.greenhome.co.me\/en\/predstavljanje-izvjestaja-iz-sjenke-za-poglavlje-27-progres-na-pauzi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.greenhome.co.me\/"},{"@type":"ListItem","position":2,"name":"Shadow Report Presentation for Chapter 27: &#8220;Progress on Pause&#8221;"}]},{"@type":"WebSite","@id":"https:\/\/www.greenhome.co.me\/#website","url":"https:\/\/www.greenhome.co.me\/","name":"Green Home","description":"Za\u0161titimo na\u0161e planine i rijeke","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.greenhome.co.me\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.greenhome.co.me\/#\/schema\/person\/181625c0a7e09b61fbf95576b404d24c","name":"bildwpgreenh","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/d67045f5dce40609ea5ef59659ab9b79ed273be7f27a3db0ce9eb491d85c3f27?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d67045f5dce40609ea5ef59659ab9b79ed273be7f27a3db0ce9eb491d85c3f27?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d67045f5dce40609ea5ef59659ab9b79ed273be7f27a3db0ce9eb491d85c3f27?s=96&d=mm&r=g","caption":"bildwpgreenh"},"sameAs":["https:\/\/www.greenhome.co.me"],"url":"https:\/\/www.greenhome.co.me\/en\/author\/bildwpgreenh\/"}]}},"_links":{"self":[{"href":"https:\/\/www.greenhome.co.me\/en\/wp-json\/wp\/v2\/posts\/8571","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.greenhome.co.me\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.greenhome.co.me\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.greenhome.co.me\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.greenhome.co.me\/en\/wp-json\/wp\/v2\/comments?post=8571"}],"version-history":[{"count":1,"href":"https:\/\/www.greenhome.co.me\/en\/wp-json\/wp\/v2\/posts\/8571\/revisions"}],"predecessor-version":[{"id":8573,"href":"https:\/\/www.greenhome.co.me\/en\/wp-json\/wp\/v2\/posts\/8571\/revisions\/8573"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.greenhome.co.me\/en\/wp-json\/wp\/v2\/media\/8559"}],"wp:attachment":[{"href":"https:\/\/www.greenhome.co.me\/en\/wp-json\/wp\/v2\/media?parent=8571"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.greenhome.co.me\/en\/wp-json\/wp\/v2\/categories?post=8571"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.greenhome.co.me\/en\/wp-json\/wp\/v2\/tags?post=8571"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}